Marriott Ko Olina

Waterslide Walkway

Actions to Protect Area

  • Cover rails with plastic and paper.
  • Use blue tape for low areas.
  • Move tools and machines carefully.
  • Set up tools and generator in safe location.
  • Cleaning is a “wet” operation.
non-slip surface installation in progress
stone cleaning

Actions to Prep Area

  • Allow to dry.
  • Apply base coat of UV stable epoxy.
  • Allow base coat to cure.
cleaned stone before non-slip surface application
non-slip surface applied over quartzite

Actions for Installation

  • Remove excess material.
  • Apply clean seal coat.
  • Allow two hours to dry.
removing excess non-slip surface
fine surfacing of non-slip surface

Actions to Seal and Finish

  • Mix sealer.
  • Apply sealer.
  • Allow two hours to dry.
preparing non-slip surface material
Non-slip surface applied over natural stone.
Non-slip surface applied over natural stone walkway