BOSS Consult BOSS Luxury Row - Waikiki A redevelopment sector of Kalakaua Avenue. Luxury Row, Waikiki Click for details Consult / Observations Repair and Resurfacing Issues:Remove etched signage from previous tenant. Etched signage area is 20 feet above the floor.Store floor in need of clean and seal. Solution Material Schedule Remove etched limestone.Replace with new 12″x36″ limestone to match. Use scissor lift to work 20 feet above ground.Requires negative air tooling environment and equipment to prevent dust and debris from spreading throughout store area.Clean and seal limestone floor with penetrating high density sealer.Estimated time to repair, resurface, clean, seal and dry: five days.