Marriott Ko Olina

Beach Club & Vacation Club

The Beach Club opened in 2003, the third tower was completed in 2012.

Consult / Observations

Koi Fishpond Bridge

Existing non-slip material was worn and peeling. The surface area was stained and smooth to touch, prone to slip/fall when wet. 

Waterslide Walkway

High traffic from pool and beach areas caused the walkway surface to be smooth and slippery. Dry coefficient was very low. Existing quartzite well maintained, but smooth and slippery. The goal was to conserve material, preserve aesthetics, reduce slip and increase safety.

resort with water features requiring non-slip surface

Solution

Material

Schedule

Koi Fishpond Bridge:  resurface walking surface of the bridge to remove old material, clean and prep to apply TUFF STUFF NonSlip Grip, a material made of a UV stable epoxy and fine-grit recycled glass that is sealed and suitable for bare feet. TUFF STUFF can be color matched and it provides a safe, non-slip surface that can be applied over concrete, metal or stone. 

Estimated time to prep, install, seal and dry: five days. 

Solution

Material

Schedule

Waterslide Walkway:  Resurface quartzite walking surface to remove staining and prep for TUFF STUFF NonSlip Grip. The material is made of fine-grit recycled glass and is naturally transparent, sealed with a translucent UV epoxy, making it suitable for bare feet. It provides a safe, non-slip surface that is highly durable. When applied over stone, it allows the beauty of the stone to be preserved. 

Estimated time to prep, install, seal and dry: five days for Area A and five days for Area B.